Author:  MichiganJeff [ Thu Oct 19, 2017 7:57 pm ]
Post subject:  Re: Blatnick To-Do List

We carved out a new fairway 13, to the left of the existing one. There are piles of brush that need to be dragged off.

At this point we're not sure which fairway will become blue/white.

Author:  MichiganJeff [ Sun Oct 29, 2017 8:42 am ]
Post subject:  Re: Blatnick To-Do List

Carved about half of the new blue fairway on 4. Beware of the razor wire thorns where we stopped.

We plan to be out sometime this week to finish off the line and set the final tee location.

Author:  jaimenhume [ Sun Oct 29, 2017 2:02 pm ]
Post subject:  Re: Blatnick To-Do List

I couldn't find the blue tee to hole 12 the other day when I played. If it is in the ground it's not too easy to see.

Author:  MichiganJeff [ Sun Oct 29, 2017 4:45 pm ]
Post subject:  Re: Blatnick To-Do List

jaimenhume wrote:
I couldn't find the blue tee to hole 12 the other day when I played. If it is in the ground it's not too easy to see.

Stakes got mowed last time they were out. I had new stakes with me Thursday but didn't get out to plant them. We have room up there to possibly make that a par 4.

Author:  MichiganJeff [ Thu Nov 02, 2017 9:36 pm ]
Post subject:  Re: Blatnick To-Do List

12 Blue tee stakes are back in...... and i'm thinking its gonna be a par 4, just over 500'

I need a big arm to go out and test it.

Author:  MichiganJeff [ Tue Nov 07, 2017 7:26 pm ]
Post subject:  Re: Blatnick To-Do List

More work done on 4 blue today........ please drag off the brush to the extreme left.

Author:  MichiganJeff [ Thu Nov 16, 2017 3:54 pm ]
Post subject:  Re: Blatnick To-Do List

Most all downed debris on 4 blue has been dragged off.
Ribbons on the trees are to help define the lines and ones we want to save for now. These may change as people get playing it and offering feedback.
The tee position is staked but that may be fine tuned before final installation.

Author:  MichiganJeff [ Wed Nov 29, 2017 6:01 pm ]
Post subject:  Re: Blatnick To-Do List

New tees are going in but back filling around the frames is needed.
I'm going to ask for mulch or fill dirt to be dropped as close to the tees as possible but we'll need volunteers to get it spread around and stomped into place.
Some of the wooded tees can be back filled with nearby dirt but it'll take some effort.

The gravel that is already in the frames need to be leveled and tamped down with feet or tools.

Details about what can be done now are listed on the first post.

Author:  MichiganJeff [ Sun Dec 03, 2017 5:56 pm ]
Post subject:  Re: Blatnick To-Do List

Tees 8 thru 12 need to be tamped down. Boots work pretty good if you wanna do them while playing.
Blue tee on 4 will need to have that material partially removed for a top layer of the finer ground stuff.